Brief notes on Port Swettenham
Then
Starting out as a small coastal port, Port Klang (then Port Swettenham) was officially opened to traffic on 15th September 1901. From its inception, it had always been earmarked as the Federated Malay States’ main port, and has remained true to its mandate ever since.
On the railway beyond Klang is Port Swettenham, a world-port, with a steam tonnage of more than a million a year and an annual trade of some twelve-and-a-half millions sterling. It lies at the landward end of an estuary in which meet the Klang and Langat rivers,and dates from the year 1901 only. The construction of it having been determined it was necessary first of all to provide some dry land, for the whole site was a tidal flat covered with mangrove growing in mud and salt water. The railway which formerly ended at Klang was therefore prolonged to the mouth of the Klang river and thousands of truck-loads of earth dumped along the sea front. At the same time a passenger jetty and three wharves to carry railway trucks were built. The jetty is on screw piles , but the wharves rest on large cylinders driven down into the mud, the deepest going 132 feet. The port, both during construction and afterwards, proved shockingly unhealthy. Malarial fever was rife and contrary to expectation grew worse steadily. Luckily it was just at this time that Governments all over the world were beginning to put into practice the conclusions of science in relation to malaria, and it was determined by the Selangor Government to put a bund or dyke all round the site, which should keep out the sea water, and to provide gates in it to drain off the rain water. As soon as the site became dry, malaria absolutely ceased, the anopheles mosquitoes, which had bred in myriads in the swamp, even in the brackish
pools of mingled sea and rain water, being dried out.This was a most notable achievement, and has now
become a classical instance of what can be done. It was felt all over the medical world, for the work had
been deliberately undertaken with a definite object, and its progress, with its concurrent effects, was kept
under observation until the expected result was reached. Yellow fever was driven out of Flavana much about the same time, and the Panama Canal zone has been freed from malaria by draining and filling operations similar to those undertaken at Port Swettenham.
Sekalung budi kepada pemilik gambar-gambar ini. Terima kasih.
http://www.rsmurthi.com/PortSwettenhamPhotos.html
http://www.rsmurthi.com/PortSwettenhamPhotos.html
Today, Port Klang is the top 13th container port in the world, with links to more than 600 ports in 180 countries over 6 continents.A well-developed and efficient transportation infrastructure is in place to handle the volume of cargo traffic at Port Klang.
By Road
The North-South Expressway runs from Bukit Kayu Hitam at the Malaysia-Thai border to the Johor Causeway in the south, covering a distance of 900 kilometres. This Expressway along the western side of the Peninula together with the Klang Valley Expressway and the Federal Highway Route 2, play an important role in the distribution of both import and export cargo between Port Klang and its hinterland.
By Rail
Keretapi Tanah Melayu Berhad (KTMB), the corporatised railway company, operates a daily block train service from Port Klang to Penang and Bangkok. There is also a 6-day-a-week rail service between the Ipoh Cargo Terminal (an inland port in the northern state of Perak) and Port Klang.
By Air
The new Kuala Lumpur International Airport commenced operations in late 1998. It is located about 75 km away in Sepang, which is part of an area designated for the Multimedia Supercorridor, Malaysia’s answer to Silicon Valley.
Port Facilities 1. Berth | ||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||
2. Storage | ||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||
3. Equipment | ||||||||||||||||||||||||||||||||||
|
The Future
Port Klang Authority has identified additional facilities as part of its supply-driven policies. When Westport is completed, the facilities at Port Klang will be sufficient to handle the projected cargo throughput 130.5 million tonnes by the year 2010. Container projection by then will be 8.4 million TEUs. As part of the master plan, the development of Port Klang will also see further expansion of port facilities south of Port Klang between Tanjung Rhu and Batu Laut (30 km from Port Klang). The major thrust of these developments will be more industrial based dealing with very large consignments. Port Klang's development is in line with the economic growth in the central region of the country and also its identity as a regional transshipment base.
Milestones
Date
|
Event
|
15 Sept 1901 | Port Swettenham officially opened to traffic. |
1903 | Amalgamation of Perak and Selangor State Railways to form FMS Railways, owner manager of Port Swettenham |
10 April 1911 | Formation of Port Swettenham Advisory Board. |
1937 |
Airport and seaplane facilities operational in Port
Swettenham.
|
1 April 1946 | Formation of Marine Department. |
1952 | Port division created in KTM. |
1 August 1953 | Port Swettenham Board replaces Port Swettenham Advisory Board. |
1955 | Port throughput hits 1 million tonnes. |
January 1960 | Contract for North Klang Straits (NKS) wharves signed. |
May 1963 | NKS wharves opened |
1 July 1963 | Port Swettenham Authority (PSA) formed, marking the port’s separation from Malayan Railways. |
2 January 1964 | PSA takes over NKS wharves |
May 1964 | PSA HQ building construction completed. |
1967 | NKS wharves renamed North Port. |
12 January 1972 | Port Swettenham renamed Port Klang. |
July 1972 | PSA renamed to Port Klang Authority (PKA), with subsequent adoption of new logo. |
July 1973 | North Port Extension wharves completed. |
5 August 1973 | Tokyo Bay is the first full container ship to dock at Port Klang. |
October 1982 | Liquid bulk terminal at North Port completed. |
1983 | PKA took over administration of Port of Malacca. |
1 July 1983 | Port Klang made fourth Port of Registry in Malaysia |
9 July 1983 | Port Klang handles its millionth container since inception. |
1985 | Cement terminal completed. |
June 1988 | On its 25th anniversary, Port Klang was declared the National Load Centre |
July 1991 | PKA adopted its third logo. |
8 August 1992 | West Port project launched. |
1 December 1992 | Port Klang operations fully privatised. |
1992 | Port Klang exceeds 1 million TEUs handled annually. |
26 August 1993 | Klang Port Container Terminal in KPM commences operation |
23 March 1996 | Westports commences operation |
September 1996 | PM Tun Dr Mahathir Mohamad officially opens Westports. |
27 May 1997 | Westports becomes the first port in Malaysia to offer bunkering services. |
October 1997 | MV Naples and MV Villa from France’s No 1 shipping line CMA berths for first time at Westports. |
1998 | Westports recognised amongst Top 10 container ports at the Asian Freight Industry Awards (AFIA) |
24 August 1998 | Regina Maersk becomes largest vessel of its kind to ever dock in Malaysia when it berthed at Westports. |
1999 | PKA received IAPH International Technology Awards for IT applications a FCZ. Westports recognised as Best Emerging Terminal by Lloyd’s List Maritime Asia. |
2000 | PKA certified ISO 9000. PKA received Excellent Service Award from the National Chamber of Commerce and Industry Malaysia (NCCIM). |
July 2000 | KCT and KPM merge to form Northport Malaysia. |
28 July 2001 | A record-setting 8.25 kilotonnes of crude palm oil loaded on MT Flores at Westports Liquid Bulk Terminal. |
2004 | Northport certified MS ISO 9002.PKFZ commences operation. PKA GM assumes Presidency of ASEAN Ports Association (APA) for two years. |
March 2004 | Southpoint handles its first ro-ro vessel, Setubal, on its maiden voyage. |
9 September 2004 | World’s largest loadage vessel, CSCL Europe, docks at Westports. |
February 2005 | Northport becomes first port in Asia to receive the P&O Nedlloyd Mondriaan, the largest of the mega-sized container carriers belonging to the P&O Nedlloyd fleet. |
5 March 2005 | Westports Dry Bulk Team unloads recordsetting 9,540 MT maize in 8 hours from MV Enterprise. |
May 2005 | PKA GM assumes position of 1st Vice President in the International Association of Ports and Harbours (IAPH) for two years. |
June 2005 | Nedlloyd Manet, P&O Nedlloyd’s flagship,embarked on its maiden voyage to Northport. |
May 2006 | Bunga Seroja Satu, the largest containership registered in Malaysia, made its maiden call at Northport. |
9 July 2006 | World’s largest container ship, Xin Los Angeles, makes maiden call at Westports. |
May 2007 | PKA GM assumes Presidency of IAPH for 2 years. |
October 2007 | Westports wins Technology Business Review ASEAN Award for Excellence in Logistics - IT Applications in Port Management |
2008 | PKA awarded 11th International Transport Award in recognition of trajectory and business excellence. |
17 November 2008 | Westports Operations Team sets 2 world records for productivity;a speed of 665mph during 1st hour of operations and moving 4,427 TEUs within 10hours. |
July 2009 | CMA CGM opens its first dedicated ODD facility at Westports. |
23 July 2009 | Northport receives Best Multi-Purpose Terminal Operator of the Year title at the Frost & Sullivan Awards. |
2009 | Northport named Best Container Terminal at the Asian Freight and Supply Chains awards (AFSCA) 2009 |
2010 | Port Klang ranked top 13th container port in the world. |
June 2010 | Northport named Best Container Terminal (handling under 4 million TEUS) at the Asian Freight and Supply Chains awards (AFSCA) |
membacanya.... sangat sangat menyentuh sanubari.
BalasPadampenghargaan kepada penulis.
saya sebenarnya mencari tapak asal atau gambar berkaitan landasan kapalterbang yg berhampiran pelabuhan klang(sekarang tiada dah...)
amat berbesar hati jiia dapat membantu...☺😊
Which year are those pictures taken from? (gambar lama/dulu)
BalasPadam